Wednesday, July 27, 2011
Side Two
Gary did SO well stripping the left side, that he kept the momentum going with side two. Now that he had the hang of exactly what to do, the right side was done more quickly than the left, 16 hours to be exact. The entry door is a textured type of aluminum like the roof. It needed to be removed to strip it, so it would be done at a later time. I was beginning to enjoy my new look. I know I was an ugly duckling before, and this was definitely an improvement. Gary had a long road ahead of him. The sides were the easiest parts to do, as well as the fastest. I wasn't sure how he was going to feel once he started on my roof. I hoped he wouldn't get too mad at me. That roof was a MESS!!!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment